Greengate Primary School

Location: Barrow-In-Furness Client Name: Jacobs Duration: 8 weeks

Project Details:

This Primary School in the Lake District coastal town of Barrow-In-Furness had phase one works were completed in summer of 2018. All works that were required could not all be done at this time due to the time constraints, the works were split up into phases and phase two was carried out during the summer months of 2019.

Project Scope:

The success of the work caried out during summer 2018 between DJH Electrical and Top Notch Builders, we have been asked to undertake Phase two works with Jacobs who are a large national company. Jacob were given an 8 week programme to complete the Phase two works at Greengate Primary and DJH Electrical contract package consisted of all electrical and integrated systems containment, main electrical systems – including power, lighting, emergency light 3 phase distribution, electrical testing and certification, Fire Alarm, Data structured cabling, disabled toilet alarms and induction loops.

Project Review:

At DJH Electrical we are pleased that our dedicated team of engineers completed our works package to our high standards, within the allotted timescales allowed. We gained kudos from our client and the building end users, as we were able to procure active equipment so that the structured data system was complete in-time for the return of the students in September.