The Dell Care Home

Location: Manchester Client Name: Franklin Group Duration: 2 weeks

Project Details:

The Dell Care Home required that the existing lighting in the Care home was upgraded to new energy efficient LED fitting. Some of these included built-in emergency back up throughout the building. This also included installing movement detection in some key communal areas.

Project Scope:

As the Care Home had residents within the building, planning the times for work to be carried out was crucial to ensuring this project caused the least disruption as possible. Throughout we worked closely with the home manager ensuring that the isolation of the lighting circuits was kept to a minimum. Soon as the areas were upgraded the immediate increase in lux levels was noticeable.

Project Review:

The project was tricky at times to ensure that the least disruption to the residents occurred and that the work was carried out as quick and safely as possible. Once more DJH Electrical completed this project within the time scales and to the high standard we have come to expect.

corridor with LED fittings